Marmaris Kebab House 51 Mattar Arcade High Street Shaftesbury SP7 8JE Data via plota.co.uk

P/LBC/2026/02640 - Listed Building Consent Approved

Proposal

Alterations to change of use of lower ground floor from former restaurant to 1no. flat & addition of 1no. window to east elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jun 2026
✓
Approved
6 Aug 2026

Approved on 6 Aug 2026 · Delegated · Last checked 5 Oct 2026

Site constraints 9

Grade II listed: 51, High Street
List entry 1108747 · The pin is inside its outline · 51 more listed buildings within 150 m (1 Grade II*, 50 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 51 with distances
Historic England ↗
Shaftesbury Conservation Area 1 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public footpath 27 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Scheduled monument 172 m away: Abbey precinct wall on Gold Hill; Radon affected area, class 3; Inside the Shaftesbury built-up area; Priority habitat 39 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Listed Building Consent
Postcode
SP7 8JE
Received
16 Jun 2026
Validated
16 Jun 2026
Ward
Shaftesbury Town Ward
Parish
Shaftesbury
Case officer
Show
Decision
Granted
Decision date
6 Aug 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 51 days from validation, 5 days faster than Dorset's median of 56 for changes of use. Approved, as 81% of changes of use here are.

51%decided within 8 weeks
81%approved
248decided in the last year

Plota live figures for changes of use decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
17 Jul 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Change of use

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026