Eugene Bann Tennis Centre, Crab Hill Lane, South Nutfield, Redhill, Surrey, RH1 5PG Data via plota.co.uk
2025/1469Approved
Proposal
Demolition of existing tennis centre and redevelopment of site to provide 9 houses with associated vehicular access, parking and landscaping. Data via plota.co.uk
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Land East Of A22 And South Of / Redhill Tonbridge Railway.. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Tree preservation order about 17 m away: Land to the east and on Redhill Aerodrome adjacent to Crab Hill Lane South Nutfield; Inside the South Nutfield built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
No scheduled monument at the site
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Work with planning data?
Every application in Tandridge - and every UK council - as a live feed, an API, or a bulk CSV export.
Decided in 141 days from validation, 65 days slower than Tandridge's median of 76 for full applications. Approved, as 83% of full applications here are.
This one141d
Council76d
UK57d
31%decided within 8 weeks
83%approved
303decided in the last year
Plota live figures for full applications decided by Tandridge in the last twelve months, from validation. Tandridge decision record →
Consultation & key dates
Comments by
11 Feb 2026
Historical activity at this location
33 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
2024Approved
Variation of Condition 2 (Drawings) of planning permission ref: 2019/13 (Demolition of ex…
2024/292
2024Approved
Variation of Condition 2 (Drawings) of planning permission ref: 2019/13 (Demolition of ex…
2024/292
2023Approved
Application for certificate of lawfulness to confirm that the carrying out of works pursu…
2023/1133
2023Approved
Application for certificate of lawfulness to confirm that the carrying out of works pursu…
2023/1133
2023Approved
Details pursuant to the discharge of condition 8 (Construction Transport Management Plan)…
2019/13/Cond1
2023Approved
Details pursuant to the discharge of condition 11 (Arboricultural Method Statement) of Ap…
2019/13/Cond2
2023Approved
Details pursuant to the discharge of condition 8 (Construction Transport Management Plan)…
2019/13/Cond1
2023Approved
Details pursuant to the discharge of condition 11 (Arboricultural Method Statement) of Ap…
Tandridge is slower than most councils at deciding householder applications: #234 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).