National Maritime Museum, Royal Museums Greenwich, Park Row, Greenwich, London, SE10 9NF Data via plota.co.uk

25/3082/TC - Tree works in a Conservation Area Approved

Proposal

Works: Reduction to historic pruning points to maintain box-pleached effect. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2025
✓
Approved
15 Oct 2025

Approved on 15 Oct 2025 · Delegation · Last checked 21 Nov 2026

Site constraints 13

World heritage site: Maritime Greenwich
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 156 m away: Thames Tideway Tunnel
The site is 156 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1.7 km); London Strategic Heat Main Project (at pre-application, 132 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Greenwich West
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
13 listed buildings within 150 m
Nearest: Monument South of Nurses' Home, Grade II, 43 m away · 13 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 13 with distances
Historic England ↗
Also on the record
Scheduled monument 161 m away: Greenwich Palace; Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Priority habitat 46 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Tree works in a Conservation Area
Postcode
SE10 9NF
Received
18 Sept 2025
Validated
18 Sept 2025
Ward
GREENWICH PARK
Parish
Greenwich
Case officer
Show
Target decision
30 Oct 2025
Decision
Raise No Objection
Decision date
15 Oct 2025
Decision level
Delegation
Applicant
Show

How this decision compares

Decided in 27 days from validation, about the council's usual 28 days. Approved, as 97% of tree works here are.

100%decided within 8 weeks
97%approved
427decided in the last year

Plota live figures for tree works decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14342469
Planning Portal ref
PP-14342469
Statutory expiry
30 Oct 2025
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 overall
Relevant to this application:
Other decisions

Greenwich is faster than most councils at deciding householder applications: #76 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026