Faraday Gardens Date Street London Southwark SE17 Data via plota.co.uk

26/AP/2507 - Certificate of Lawful Dev. - Proposed Approved

Proposal

Certificate of Lawfulness (proposed) for improvement works to the playground at Faraday Gardens to include the removal of current playground equipment and installation of new accessible equipment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Validated
7 Sept 2026
✓
Approved
29 Oct 2026

Approved on 29 Oct 2026 · Delegated Panel - Simple · Last checked 30 Oct 2026

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Liverpool Grove conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1.4 km away: Thames Tideway Tunnel; Radon affected area, class 2; 4 listed buildings within 150 m; Inside the Southwark built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Certificate of Lawful Dev. - Proposed
Received
21 Aug 2026
Validated
7 Sept 2026
Ward
Faraday
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
1 Nov 2026
Decision
Certificate of Lawfulness Prop- GRANTED
Decision date
29 Oct 2026
Decision level
Delegated Panel - Simple
Applicant
Show

How this decision compares

Decided in 52 days from validation, about the council's usual 54 days. Approved, as 98% of community buildings here are.

54%decided within 8 weeks
98%approved
55decided in the last year

Plota live figures for community buildings decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 30 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Nov 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026