53 Churchfield Road Acton W3 6AY Data via plota.co.uk

263421FUL - Full Application Pending Consideration

Proposal

Installation of air conditioning condenser to first floor flat roof to front elevation Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
11 Sept 2026
✓
Validated
5 Nov 2026
✓
Consultation
5 Nov 2026
Decision
Expected by 31 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Jan 2027 and 15 Jan 2027, from Ealing's recent utility and infrastructure works.

Comments are open until 2 Dec 2026

Comment on this application ↗

Site constraints 8

Acton Town Centre conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Acton Town Centre, Acton
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Acton
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 435 m away: Thames Tideway Tunnel
The site is 435 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £160,000 in May 2023. Other property, freehold.

23 May 2023£160,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area26 m² (280 sq ft)
Energy ratingD (asset rating 96)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in April 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W3 6AY
Received
11 Sept 2026
Validated
5 Nov 2026
Ward
South Acton
Target decision
31 Dec 2026
Applicant
Show
Agent
Coton Design & Build Limited
Freehold owner
Show

Decision outlook

Day 18 of the 56-day target. Ealing usually decides utility and infrastructure works by day 63.

Day 1845 days to the predicted decision (day 63)
39%decided within 8 weeks
86%approved
75decided in the last year

Plota live figures for utility and infrastructure works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15155259
Planning Portal ref
PP-15155259
Consultation
5 Nov 2026
Comments by
2 Dec 2026
Site or press notice
11 Nov 2026
Statutory expiry
31 Dec 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.