Nest The Holywell Road Newquay Cornwall TR7 2PB Data via plota.co.uk

PA26/07486 - Permission in Principle Awaiting decision

Proposal

Application for Permission in Principle for the construction of up to 5 dwellings (minimum of 4, maximum of 5) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 26 Oct 2026
✓
Consultation
9 Nov 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Dec 2026, from Cornwall's recent new homes.

Comments are open until 30 Nov 2026

Comment on this application ↗

Site constraints 3

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m; Inside the Newquay built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area132 m² (1,421 sq ft)
Energy ratingD (66 out of 100), could reach C
PropertyDetached bungalow, 4 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsSystem built, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Permission in Principle
Postcode
TR7 2PB
Received
around 26 Oct 2026
Validated
26 Oct 2026
Ward
Newquay Central And Pentire
Parish
Newquay
Case officer
Show
Target decision
30 Nov 2026
Applicant
Show
Agent
Purelight Architecture And Landscape

Decision outlook

Day 28 of the 56-day target. Cornwall usually decides new homes by day 55.

Day 2828 days to the 56-day target
65%decided within 8 weeks
87%approved
100%go to committee

Plota live figures for new homes decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15322262
Planning Portal ref
PP-15322262
Comments by
30 Nov 2026
Site or press notice
9 Nov 2026
Statutory expiry
30 Nov 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 overall
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.