26/3081/TPO - Works to TPO Trees Pending Consideration

Proposal

Trees that are within 5 meters of the boundary and could potentially fall on my house I would like reduce in height by up to 25% and I would like to trim back branches that overhang the boundary between my property and hollinhey wood, I would also like to trim back the one in my front garden and reduce the height by 25% Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
1 Sept 2026
Decision
Target date was 27 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 7 Nov 2026, from Cheshire East's recent tree and landscaping works.

Site constraints 8

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Ancient woodland 6 m away: Hollinhey Wood
Inside the 15 m buffer standing advice asks for from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; Priority habitat 8 m away: Deciduous woodland; Inside the Sutton Lane Ends built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to TPO Trees
Postcode
SK11 0DR
Received
24 Aug 2026
Validated
1 Sept 2026
Ward
Sutton
Parish
Sutton
Case officer
Show
Target decision
27 Oct 2026
Decision level
Delegation
Applicant
Show

Decision outlook

Day 59, past the statutory target. 81% of tree and landscaping works in Cheshire East are decided within thirteen weeks, which runs to 1 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 29 Oct 2026.

Day 593 days past the 56-day target
49%decided within 8 weeks
96%approved
644decided in the last year

Plota live figures for tree and landscaping works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Statutory expiry
27 Oct 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 councils
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026