Communications Station Cam0098 Manor Farm Fulbourn Road Teversham Cambridgeshire Data via plota.co.uk

26/02846/TELNOT - Telecommunications Notifications (Reg 5) Awaiting decision

Proposal

Install a new 10kVA generator on new concrete foundation. Power duct to be installed from source to generator. Wide cable trunking to be installed on concrete base. AMF panel to be installed on the new pole. Vegetation removed. New outdoor M35PSU cabinet required. Concrete collar to be installed. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Jul 2026
✓
Validated
18 Aug 2026
Decision
Target date was 14 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 97.

Site constraints 6

Green belt: Cambridge
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument 38 m away: Moated site at Manor Farm
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
1 listed building within 150 m; National infrastructure project 1.1 km away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application.
Not affected
Outside flood zones 2 and 3

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Telecommunications Notifications (Reg 5)
Received
28 Jul 2026
Validated
18 Aug 2026
Ward
Fen Ditton & Fulbourn
Parish
Teversham CP
Case officer
Show
Target decision
14 Sept 2026
Agent
WHP Telecoms Ltd

Decision outlook

Day 97, past the statutory target. 79% of utility and infrastructure works in Cambridge are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 9741 days past the 56-day target
63%decided within 8 weeks
93%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
14 Sept 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026