Land off Fletchwood Lane, Totton, Southampton, SO40 7DZ Data via plota.co.uk

25/00760FULL - Major - EIA Refused

Proposal

Installation of ground-mounted photovoltaic farm; associated infrastructure and engineering works; deer fencing, pole-mounted CCTV; community open space; landscaping and habitat enhancement for a temporary period of 25 years Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jul 2025
✓
Consultation
28 Jul 2025
✓
Validated
5 Aug 2025
✗
Refused
17 Mar 2026
Appeal
Appeal lodged

Refused on 17 Mar 2026 · Planning Committee · Last checked 19 Nov 2026

Planning committee

Decided by New Forest (Park) Planning Committee on 17 Mar 2026.

Refused

As officers recommended.

  • Officers advised refusal because the scheme would harm the National Park landscape and renewable energy benefits could not outweigh that harm.
  • People expressed support for renewable energy and ecological improvements, while others raised concerns about landscape, farmland, highways, noise and precedent.
  • The committee voted 3:1 to refuse planning consent for landscape and highway-safety reasons.
Read how the committee decided The proposal, site history, officers’ assessment, public views, speakers, vote and reasons for refusal.

Source: Plota analysis of New Forest (Park)'s committee minutes of 17 Mar 2026.

Site constraints 11

Surface water flood riskSpecial protection areaAerodrome safeguarding zoneFlood zone 3Flood zone 2
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 168 m away: Fletchwood Meadows SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Special protection areaCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Flood zone 3Council record
The council's own flood layer for this site.
Council site ↗
Flood zone 2Council record
The council's own flood layer for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a solar farm?

Plota Sites searches every land parcel in England and Wales: 29,327 sites fit this search. On and off the market, free to search.

Land for solar farms
Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Major - EIA
Postcode
SO40 7DZ
Received
11 Jul 2025
Validated
5 Aug 2025
Parish
Netley Marsh Parish Council, Ashurst and Colbury Parish Council
Case officer
Show
Target decision
17 Nov 2025
Decision
Refuse
Decision date
17 Mar 2026
Decision level
Planning Committee
Applicant
Show

How this decision compares

Decided in 224 days from validation, 173 days slower than New Forest (Park)'s median of 51 for full applications. Refused, as 9% of full applications here are.

69%decided within 8 weeks
91%approved
82%go to committee

Plota live figures for full applications decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
PP-13021649
Comments by
1 Sept 2025
Site or press notice
28 Jul 2025
Committee
17 Mar 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 overall
Relevant to this application:
Major dwellings

New Forest (Park) is slower than most councils at deciding householder applications: #254 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026