Seaton Tramway Riverside Depot Harbour Road Seaton EX12 2NQ Data via plota.co.uk

26/1754/FUL - Full Application Awaiting decision

Proposal

Extension to the existing tram depot to provide additional internal storage and maintenance space Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2026
Decision
Expected by 22 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Oct 2026 and 4 Nov 2026, from East Devon's recent commercial and major works.

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National landscape 192 m away: East Devon; Local nature reserve 377 m away: Seaton Marshes; Flood defence 10 m away (wall, designed for a 1 in 200 year flood); Scheduled monument 246 m away: The Axe Boat, 22m north of the Axmouth Road Bridge; SSSI 490 m away: Axmouth to Lyme Regis Under Cliffs SSSI; Heritage coast 11 m away: East Devon; Priority habitat 13 m away: Mudflats.
Not affected
Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area827 m² (8,902 sq ft)
Energy ratingD (asset rating 91)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX12 2NQ
Received
27 Aug 2026
Validated
27 Aug 2026
Ward
Seaton
Parish
Seaton
Applicant
Show
Agent
Fable Architects

Decision outlook

Day 43 of the 56-day target. East Devon usually decides commercial and major works by day 59.

Day 4316 days to the predicted decision (day 59)
49%decided within 8 weeks
95%approved
6%go to committee

Plota live figures for commercial and major works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

1comment received
1 supporting

8 neighbours consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15162489
Planning Portal ref
PP-15162489
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.