Land north of Waun-hir Bungalow, Pembrey Road, Trimsaran, Kidwelly, SA17 4DT Data via plota.co.uk

PL/11413 - Full planning permission In Review

Proposal

Erection of an enclosure around the existing DNO substation to resolve water ingress issues Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
17 Sept 2026
Decision
Expected by 9 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 67.

The consultation period closed on 15 Oct 2026.

Site constraints 4

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2; National infrastructure project: Gwynt Glas Offshore Wind Farm, at pre-application; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA17 4DT
Received
15 Sept 2026
Validated
17 Sept 2026
Ward
Trimsaran
Parish
Trimsaran
Case officer
Show
Target decision
9 Dec 2026

Decision outlook

Day 67, past the statutory target. 80% of utility and infrastructure works in Carmarthenshire are decided within thirteen weeks, which runs to 17 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 6711 days past the 56-day target
54%decided within 8 weeks
89%approved
36decided in the last year

Plota live figures for utility and infrastructure works decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
15 Oct 2026