33 Mornington Road Lytham St Annes FY8 5BA Data via plota.co.uk

25/0571 - Householder Planning Application Approved

Proposal

Single storey rear extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2025
✓
Validated
8 Oct 2025
✓
Approved
3 Nov 2025

Approved on 3 Nov 2025 · Delegated · Last checked 10 Oct 2026

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 1 km away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is 1 km from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI 196 m away: Ribble Estuary SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Special protection area 315 m away: Ribble & Alt Estuaries
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Inside the Lytham St Anne's built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area70 m² (753 sq ft)
Energy ratingD (55 out of 100), could reach B
PropertySemi-detached house, 5 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2014, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Fylde - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fylde
Application type
Householder Planning Application
Postcode
FY8 5BA
Received
25 Sept 2025
Validated
8 Oct 2025
Ward
Lytham East
Parish
Lytham
Case officer
Show
Decision
Granted
Decision date
3 Nov 2025
Decision level
Delegated
Applicant
Show
Agent
Brimas Construction

How this decision compares

Decided in 26 days from validation, 26 days faster than Fylde's median of 52 for extensions. Approved, as 97% of extensions here are.

68%decided within 8 weeks
97%approved
233decided in the last year

Plota live figures for extensions decided by Fylde in the last twelve months, from validation. Fylde decision record →

Consultation & key dates

Consultation
8 Oct 2025
Comments by
29 Oct 2025
Fylde
Planning Authority Score
5.3/10
Average
#130 of 296 overall
Relevant to this application:
Householder decisions

Fylde is #184 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Fylde decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #11 of 296
98%
Householder approved
Above avg (90%) #17 of 296
60%
Decided in 8 weeks
Below avg (63%) #184 of 296
49%
Extended time limit
Above avg (41%) #220 of 296
79%
Minor dwellings approved
43 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
100%
Change of use approved
28 decided
422
Total decisions
16 refused in the year to March 2026