Land Adjacent To High Marnham Power Station Power Station Access Fledborough Road High Marnham Nottinghamshire Data via plota.co.uk

25/01302/FUL - Full Planning Permission Approved

Proposal

Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one Supergrid Transformer (SGT) and One SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Nov 2025
✓
Validated
27 Nov 2025
✓
Consultation
4 Mar 2026
✓
Approved
23 Jun 2026

Approved on 23 Jun 2026 · Delegated After Referring To PCG · Last checked 7 Oct 2026

Documents 55

Statements & assessments 21

PDF ECOLOGY RESPONSE 23.03.2026 Consultation Replies · 23 Mar 2026 View ↗ PDF BIODIVERSITY NET GAIN REPORT - 04.03.2026 Biodiversity Net Gain · 4 Mar 2026 View ↗ PDF BIODIVERSITY NET GAIN REPORT - APPENDIX G - 04.03.2026 Biodiversity Net Gain · 4 Mar 2026 View ↗ PDF TRENT VALLEY INTERNAL DRAINAGE BOARD - 21.01.2026 Consultation Replies · 21 Jan 2026 View ↗ PDF BDC CONSERVATION / HERITAGE - 06.01.2025 Consultation Replies · 6 Jan 2026 View ↗ PDF BDC LEAD ECOLOGY 31.12.25 Consultation Replies · 31 Dec 2025 View ↗ PDF BIODIVERSITY NET GAIN REPORT Biodiversity Net Gain · 20 Nov 2025 View ↗ PDF GAZETTEER OF CULTURAL HERITAGE ASSETS Supporting Information · 20 Nov 2025 View ↗ PDF CULTURAL HERITAGE DESK BASED ASSESSMENT Supporting Information · 20 Nov 2025 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT REPORT Supporting Information · 20 Nov 2025 View ↗ PDF CONSTRUCTION DUST ASSESSMENT AND METHODOLOGY Supporting Information · 20 Nov 2025 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Supporting Information · 20 Nov 2025 View ↗ PDF SURFACE WATER DRAINAGE STRATEGY Supporting Information · 20 Nov 2025 View ↗ PDF NOISE IMPACT ASSESSMENT Supporting Information · 20 Nov 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT Supporting Information · 20 Nov 2025 View ↗ PDF ANNEX B GROUNDSURE ORDNANCE SURVEY MAPS PART 2 OF 3 Supporting Information · 20 Nov 2025 View ↗ PDF ANNEX B GROUNDSURE ORDNANCE SURVEY MAPS PART 1 OF 3 Supporting Information · 20 Nov 2025 View ↗ PDF ANNEX B GROUNDSURE ORDNANCE SURVEY MAPS PART 3 OF 3 Supporting Information · 20 Nov 2025 View ↗ PDF FLOOD RISK ASSESSMENT Supporting Information · 20 Nov 2025 View ↗ PDF SURFACE WATER DRAINAGE STRATEGY Supporting Information · 20 Nov 2025 View ↗ PDF SURFACE WATER DRAINAGE STRATEGY Supporting Information · 20 Nov 2025 View ↗

All documents on the council site ↗

Site constraints 2

National infrastructure project: One Earth Solar Farm
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: North Humber to High Marnham (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bassetlaw - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bassetlaw
Application type
Full Planning Permission
Received
20 Nov 2025
Validated
27 Nov 2025
Ward
Tuxford And Trent
Parish
Marnham
Case officer
Show
Target decision
26 Jun 2026
Decision
Grant
Decision date
23 Jun 2026
Decision level
Delegated After Referring To PCG
Agent
Arcadis

How this decision compares

Decided in 208 days from validation, 129 days slower than Bassetlaw's median of 79 for full applications. Approved, as 73% of full applications here are.

27%decided within 8 weeks
73%approved
121decided in the last year

Plota live figures for full applications decided by Bassetlaw in the last twelve months, from validation. Bassetlaw decision record →

Public comments

4comments received
4 objecting

100% object · above the UK average of 74%

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14401036
Planning Portal ref
PP-14401036
Consultation
4 Mar 2026
Comments by
18 Mar 2026
Site or press notice
4 Dec 2025
Statutory expiry
26 Feb 2026
Env. assessment
No
Bassetlaw
Planning Authority Score
1.2/10
Poor
#286 of 296 councils
Relevant to this application:
Householder decisions

Bassetlaw is one of the slowest councils in England for householder decisions, ranking #291 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bassetlaw decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #203 of 296
89%
Householder approved
Below avg (90%) #199 of 296
25%
Decided in 8 weeks
Below avg (63%) #291 of 296
73%
Extended time limit
Above avg (41%) #289 of 296
68%
Minor dwellings approved
77 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
78%
Change of use approved
45 decided
575
Total decisions
87 refused in the year to March 2026