P/HOU/2026/05835 - Householder Planning Permission Out To Consultation

Proposal

Installation of 16 no. ground-mounted solar panels and associated groundworks, including an underground DC cable connection, together with associated inverter and battery storage equipment Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Nov 2026
Decision
Expected by 13 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 9 Jan 2027 and 19 Jan 2027, from Dorset's recent utility and infrastructure works.

Comments are open until 10 Dec 2026

Comment on this application ↗

Site constraints 7

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 195 m away: Dorset Heaths
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 775 m away: Navitus Bay Wind Park
The site is 775 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI 159 m away: St Leonards and St Ives Heaths SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Priority habitat 48 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £790,000 in November 2017. Other property, freehold.

More than one property is recorded at this address: HM Land Registry does not always give the flat or unit.

22 November 2017£790,000Recorded as a transfer outside a standard sale
18 September 2009£351,001Detached house
12 January 1995£137,500Detached house

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area166 m² (1,787 sq ft)
Energy ratingC (71 out of 100)
PropertyDetached bungalow, 5 habitable rooms
Built2012 onwards
HeatingAir source heat pump, underfloor, electric
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in December 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Looking for land for a solar farm?

Plota Sites searches every land parcel in England and Wales: 29,327 sites fit this search. On and off the market, free to search.

Land for solar farms
Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Householder Planning Permission
Postcode
BH24 2SG
Received
18 Nov 2026
Validated
18 Nov 2026
Ward
St. Leonards and St. Ives Ward
Parish
St. Leonards and St. Ives
Case officer
Show
Applicant
Show
Agent
Homz Planning

Decision outlook

Day 5 of the 56-day target. Dorset usually decides utility and infrastructure works by day 55.

Day 551 days to the 56-day target
55%decided within 8 weeks
92%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
10 Dec 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 overall
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications: #51 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.