11 Robin Hood Chase Sheffield S6 6FH Data via plota.co.uk

26/02545/FUL - Full Planning Application Approved

Proposal

Erection of raised platform in garden of dwellinghouse Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
✓
Validated
21 Sept 2026
✓
Approved
19 Oct 2026

Approved on 19 Oct 2026 · Delegated decision · Last checked 25 Oct 2026

Site constraints 10

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Public footpath 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Air quality management area: Sheffield Citywide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
SSSI 16 m away: Stannington Ruffs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Green belt 5 m away: South and West Yorkshire; Inside the Sheffield built-up area; Priority habitat 15 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £425,000 in June 2019. Detached house, leasehold.

6 June 2019£425,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area158 m² (1,701 sq ft)
Energy ratingC (70 out of 100)
PropertyDetached house, 9 habitable rooms
Built1983 to 1990
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in October 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Sheffield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sheffield
Application type
Full Planning Application
Postcode
S6 6FH
Received
25 Aug 2026
Validated
21 Sept 2026
Ward
Stannington
Parish
Bradfield Parish Council
Case officer
Show
Target decision
16 Nov 2026
Decision
Grant Conditionally
Decision date
19 Oct 2026
Decision level
Delegated decision
Applicant
Show

How this decision compares

Decided in 28 days from validation, 27 days faster than Sheffield's median of 55 for extensions. Approved, as 89% of extensions here are.

68%decided within 8 weeks
89%approved
1,043decided in the last year

Plota live figures for extensions decided by Sheffield in the last twelve months, from validation. Sheffield decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 25 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15184748
Planning Portal ref
PP-15184748
Statutory expiry
16 Nov 2026
Env. assessment
No
Sheffield
Planning Authority Score
4.4/10
Below average
#183 of 296 overall
Relevant to this application:
Householder decisions

Sheffield is #176 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sheffield decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #178 of 296
89%
Householder approved
Below avg (90%) #209 of 296
61%
Decided in 8 weeks
Below avg (63%) #176 of 296
36%
Extended time limit
Below avg (41%) #114 of 296
71%
Minor dwellings approved
144 decided (1-9 homes)
85%
Major dwellings approved
33 decided (10+ homes)
87%
Change of use approved
124 decided
1,756
Total decisions
237 refused in the year to March 2026