Phase MP4 Plot H11B Former Heygate Estate Heygate Street London Southwark SE17 Data via plota.co.uk

26/AP/2856 - Approval of Details Under consideration/assessment

Proposal

Details of condition 5 (Hard and soft landscaping) pursuant to planning permission (Application for the approval of reserved matters (access, scale, appearance, layout and landscaping) for Plot H11B within Elephant Park (previously referred to as the Heygate Masterplan), submitted pursuant to the Outline Planning Permission ref: . The proposals comprise the construction of two buildings of between 11 and 25 storeys in height (maximum building height 84.2m AOD) comprising 259 residential units, 285 sqm (GEA) flexible retail, office, community and leisure uses (Classes A1-A5/B1/D1/D2), cycle storage, servicing, plant areas, landscaping, new public realm, and other associated works.) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Sept 2026
✓
Validated
29 Sept 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 23 Nov 2026.

Site constraints 14

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Central Activities Zone · Elephant and Castle Major Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Tree preservation order: Elephant Park, Castle Square & South Gardens
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Elephant and Castle/ Walworth Road
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
National infrastructure project 1050 m away: Thames Tideway Tunnel
The site is 1050 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 532 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area 45 m away: Yates Estate and Victory; Wider setting of protected view 23A.1 Centre of Bridge over the Serpentine to the Palace of Westminster; Radon affected area, class 2; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Received
28 Sept 2026
Validated
29 Sept 2026
Ward
North Walworth
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
23 Nov 2026
Applicant
Show
Agent
DP9 Ltd

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
23 Nov 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026