Grove Farm Holywell Lane Utterby Lincolnshire LN11 0TU Data via plota.co.uk

00937/26/DPC - Discharge of Planning Conditions Decided

Proposal

Discharge of condition 4 (archaeology part 1), condition 5 (archaeology part 2) and condition 6 (archaeology part 3) imposed on . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jun 2026
✓
Responded
4 Aug 2026

Responded on 4 Aug 2026 · Last checked 2 Sept 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 4, 5, 6 decided (outcome not recorded)

    • ConditionsDischarge of condition 4 (archaeology part 1), condition 5 (archaeology part 2) and condition…This application00937/26/DPC

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 413 m away: Viking CCS Pipeline
The site is 413 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Grimsby to Walpole (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area135 m² (1,453 sq ft)
Energy ratingF (38 out of 100), could reach A
PropertyDetached house, 7 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, oil
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Postcode
LN11 0TU
Received
9 Jun 2026
Validated
9 Jun 2026
Ward
Fulstow Ward
Parish
Utterby
Case officer
Show
Target decision
4 Aug 2026
Decision
Responded
Decision date
4 Aug 2026
Applicant
Show
Agent
Dieter Nelson Planning Consultancy

Public comments

No public comments yet.

Last counted 2 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14994274
Planning Portal ref
PP-14994274
Comments by
14 Jul 2026
Statutory expiry
4 Aug 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.