Jcn of Central Grove On Central Road CW9 7JD Data via plota.co.uk

26/03151/DSM - DSLAM/Antenna Notification Approved

Proposal

Install fixed line broadband apparatus. Ref: Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
✓
Approved
2 Oct 2026

Approved on 2 Oct 2026 · Last checked 4 Oct 2026

Site constraints 2

National infrastructure project about 119 m away: Keuper Gas Storage Project
The site is about 119 m from the project boundary. Underground gas storage, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Rudheath built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
DSLAM/Antenna Notification
Postcode
CW9 7JD
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
Rudheath
Parish
Rudheath
Decision
Notification Closed
Decision date
2 Oct 2026
Applicant
Show

How this decision compares

Decided in 1 days from validation, about the council's usual 1 days. Approved, as 99% of utility and infrastructure works here are.

90%decided within 8 weeks
99%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

Last counted 4 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No