Land At Golden Sands Holiday Park Quebec Road Mablethorpe Lincolnshire Data via plota.co.uk

00639/26/FUL - Full Planning Permission Awaiting decision

Proposal

Planning Permission - Installation of a modular hot food takeaway and siting of a chiller/freezer unit. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Apr 2026
✓
Consultation
18 Sept 2026
Decision
Expected by 11 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 9 Oct 2026; it is now day 175.

Comments are open until 9 Oct 2026

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 477 m away: Viking CCS Pipeline
The site is 477 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Theddlethorpe Flexible Generation Project (at pre-application, 868 m); Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 1009 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Ramsar wetland 359 m away: Humber Estuary; SSSI 359 m away: Saltfleetby - Theddlethorpe Dunes SSSI; Inside the Mablethorpe built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
LN12 1QJ
Received
17 Apr 2026
Validated
17 Apr 2026
Ward
Mablethorpe Ward
Parish
Mablethorpe & Sutton
Case officer
Show
Target decision
11 Sept 2026
Applicant
Show
Agent
Planware Ltd

Decision outlook

Day 175, past the statutory target. 77% of commercial and major works in East Lindsey are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 1751 days to the predicted decision (day 176)
52%decided within 8 weeks
96%approved
72decided in the last year

Plota live figures for commercial and major works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

1comment received
1 supporting

11 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14700791
Planning Portal ref
PP-14700791
Neighbours
5 May 2026
Consultation
18 Sept 2026
Comments by
9 Oct 2026
Site or press notice
30 Apr 2026
Statutory expiry
12 Jun 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026