Development Site At 130 Fenchurch Street City Of London London EC3M 5DJ Data via plota.co.uk

25/06101/OBS - Application for obs to adj boroughs Decided

Proposal

RECONSULTATION: Phased development for the demolition of all buildings and structures to existing slab level, erection of a new building comprising 3 basement levels, ground plus 34 storeys (161.46m AOD, 145.86m AGL) to provide a mixed use office (Class E(g)), culture (Class F1/E), public viewing gallery (Sui Generis), flexible retail (Class E(a)-(b)) development with soft and hard landscaping, pedestrian and vehicular access, cycle parking, flexible public realm including programmable space with associated highway works and all other works associated with the development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2025
Decision
Target date was 17 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 448.

Site constraints 11

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 269 m away: Thames Tideway Tunnel
The site is 269 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 422 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
9 listed buildings within 150 m
Nearest: 37-39, Lime Street, Grade II, 53 m away · 3 Grade I, 1 Grade II*, 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Also on the record
Conservation area 43 m away: Leadenhall Market; Scheduled monument 211 m away: Roman wall in basement of 90 Gracechurch Street; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 30 m away; Town centre 31 m away: Leadenhall Market.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Application for obs to adj boroughs
Postcode
EC3M 5DJ
Received
27 Aug 2025
Validated
27 Aug 2025
Case officer
Show
Target decision
17 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
City Of London

Decision outlook

Day 448, past the statutory target. 84% of other in Westminster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 13 Nov 2026.

Day 448392 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Westminster to go on. Westminster decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026