SDNP/26/01838/HOUS - Householder Approved

Proposal

Erection of oak framed garage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 May 2026
✓
Validated
20 May 2026
✓
Approved
23 Sept 2026

Approved on 23 Sept 2026 · LA Delegated Decision · Last checked 24 Sept 2026

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
South Downs National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 202 m away: Southampton to London Pipeline Project
The site is 202 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £8,000,000 in March 2025. Other property, freehold.

7 March 2025£8,000,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area71 m² (764 sq ft)
Energy ratingC (73 out of 100), could reach B
PropertyDetached bungalow, 1 habitable room
Built2007 to 2011
HeatingCommunity scheme
WallsTimber frame, as built, insulated (assumed)

From the energy performance certificate lodged in March 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
SO32 1QF
Received
12 May 2026
Validated
20 May 2026
Ward
Upper Meon Valley Ward
Parish
Exton Parish Meeting
Case officer
Show
Target decision
28 Sept 2026
Decision
Approved
Decision date
23 Sept 2026
Decision level
LA Delegated Decision
Applicant
Show

How this decision compares

Decided in 126 days from validation, 67 days slower than South Downs's median of 59 for extensions. Approved, as 92% of extensions here are.

47%decided within 8 weeks
92%approved
795decided in the last year

Plota live figures for extensions decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14924042
Planning Portal ref
PP-14924042
Statutory expiry
15 Jul 2026
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.