30 Gloucester Place London W1U 8PL Data via plota.co.uk
Proposal
Internal alterations at ground floor level. (Linked 25/04956/NMA) Data via plota.co.uk
Application progress
Approved on 5 Aug 2025 · Delegated Decision · Last checked 29 Oct 2026
Documents 13
Decision & officer reports 2
Statements & assessments 2
Plans & drawings 6
Application forms 1
Associated applications 16
- Internal alterations at ground floor level. (Linked)
Conditions , , , varied
Site constraints 11
Show the other 26 with distances
- 31 m21-75, Gloucester Place W1Grade II
- 47 mWorcester Arms Public HouseGrade II
- 47 m71-87, George Street W1Grade II
- 49 m42-70, Gloucester Place W1Grade II
- 50 m100-106, Blandford Street W1Grade II
- 59 m21b, Gloucester Place W1Grade II
- 71 m6, Montagu Square W1Grade II
- 71 m1-5, Montagu Square W1Grade II
- 72 m7-12, Montagu Square W1Grade II
- 93 m13-17, Montagu Square W1Grade II
- 100 m10, Portman Close W1Grade I
- 114 mCourtauld Institute, Eastern PartGrade II
- 120 m18, Montagu Square W1Grade II
- 126 m19, Montagu Square W1Grade II
- 132 m20-22, Montagu Square W1Grade II
- 134 mWater Pump Set in Central Garden Opposite Number 15Grade II
- 134 mHome House (Courtauld Institute)Grade I
- 135 mRoyal Intitute of British Architects Drawings CollectionGrade I
- 137 m52-59, Montagu Square W1Grade II
- 137 m60, Montagu Square W1Grade II
- 137 m61-63, Montagu Square W1Grade II
- 144 m12, Montagu Street W1Grade II
- 145 m34, Baker Street W1Grade II
- 146 m13 and 14, Montagu Street W1Grade II
- 146 m67, BLANDFORD STREET (See details for further address information)Grade II
- 147 m50 and 51, Montagu Square W1Grade II
Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Second Floor 31 Gloucester Place London W1U 6HT
Erection of safety railings to raised patio area accessible from existing french...
29 Gloucester Place London W1U 8HT
Installation of glazed partitions and door sets to form meeting rooms on 2nd , 3...
90 Gloucester Place London W1U 6HS
Use of the building as an embassy (sui generis)
89 Gloucester Place London W1U 6JG
Internal heritage repairs to the entrance hall north party wall and adjacent to ...
Nearby new applications
33 Robert Adam Street London W1U 3HP
Details of how waste is to be stored on site and how materials for recycling wil...
30 Portman Square London W1H 7BH
Infilling of existing ground floor under croft to enlarge the existing hotel (Cl...
59 Blandford Street London W1U 7HP
Installation of two retractable awnings on the shopfront.
44 Welbeck Street London W1G 8DY
Detailed drawings of the ventilation grilles pursuant to part conditions 6 (ii) ...
44 Welbeck Street London W1G 8DY
Details of new door and window; pursuant to condition 5 of Listed Building Conse...
44 Welbeck Street London W1G 8DY
Detailed drawings of the ventilation grilles pursuant to part conditions 3ii of ...
Important details
- Council
- Westminster
- Application type
- Listed Building Consent Application
- Postcode
- W1U 8PL
- Received
- 16 Jul 2025
- Validated
- 16 Jul 2025
- Ward
- Marylebone
- Case officer
- Show
- Target decision
- 10 Sept 2025
- Decision
- Application Permitted
- Decision date
- 5 Aug 2025
- Decision level
- Delegated Decision
- Applicant
- Show
- Agent
- Newmark
- Leaseholder
- Show
How this decision compares
Decided in 20 days from validation, 37 days faster than Westminster's median of 57 for listed building works. Approved, as 90% of listed building works here are.
Plota live figures for listed building works decided by Westminster in the last twelve months, from validation. Westminster decision record →
Public comments
No public comments yet.
Last counted 29 Oct 2026
Consultation & key dates
- Alt. reference
- PP-14169428
- Planning Portal ref
- PP-14169428
- Env. assessment
- No
Historical activity at this location
32 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Westminster is slower than most councils at deciding householder applications: #258 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.
Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.
Track this application
30 Gloucester Place London W1U 8PL
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Leaseholders, on paid plans
The companies holding a lease of this property or of part of its building, from HM Land Registry's register of company-owned property, with its status, business and the companies that control it from Companies House, is shown to Plota subscribers. Plans start at £49 a month.
See paid plansAlready subscribed? Sign in with the email on your plan and this page will show it.
That's today's owners
Your plan shows up to 100 freehold owners a day on the site, and more from tomorrow. For owners in bulk, the API gives them on every record on the Pro plan and above.
See API plansCouncil archive
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six…
- Received
- 30 Oct 2020
- Decided
- 22 Jun 2021
- Outcome
- Approved
- Type
- Full
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an…
- Received
- 10 Mar 2025
- Outcome
- Pending
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an…
- Received
- 4 Oct 2023
- Decided
- 13 Nov 2023
- Outcome
- Approved
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN: 20/06914/FULL) for, 'Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of…
- Received
- 11 Sep 2023
- Decided
- 14 May 2024
- Outcome
- Approved
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an…
- Received
- 17 May 2023
- Decided
- 26 May 2023
- Outcome
- Approved
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an…
- Received
- 25 Jan 2023
- Decided
- 2 Mar 2023
- Outcome
- Approved
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an…
- Received
- 12 Aug 2022
- Decided
- 30 Sep 2022
- Outcome
- Approved
- Homes
- 51
27 Baker Street London W1U 8AH
Variation of conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL ) for the: Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing offices (Class B1), retail (Class A1 and flexible Class A1/A3 units) and up to 51 residential units (Class C3) within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus…
- Received
- 28 Aug 2019
- Decided
- 12 Nov 2019
- Outcome
- Approved
- Type
- Full
- Homes
- 51
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 4th March 2020 (RN 19/06767/FULL) which permitted variations to conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) : Namely to amend the description of development to read as follows: Variation of conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) for the: Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme…
- Received
- 26 Aug 2020
- Decided
- 13 Oct 2020
- Outcome
- Approved
- Homes
- 51
