Quadrant East 16 The Silverlink North Cobalt Business Park West Allotment Newcastle Upon Tyne NE27 0BY Data via plota.co.uk

25/01398/ADV - express consent to display an advert Approved

Proposal

Flags on existing flagpoles Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Oct 2025
✓
Validated
30 Oct 2025
✓
Consultation
4 Nov 2025
✓
Approved
3 Dec 2025

Approved on 3 Dec 2025 · Delegated Decision · Last checked 14 Oct 2026

Site constraints 5

Local nature reserve 35 m away: Silverlink Biodiversity Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 750 m away: A19/A1058 Coast Road Junction Improvement
The site is 750 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Recorded mine shaft 48 m away; Inside the Tynemouth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £31,800,000 in September 2024. Other property, leasehold.

17 September 2024£31,800,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area14,143 m² (152,234 sq ft)
Energy ratingC (asset rating 60)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in September 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
express consent to display an advert
Postcode
NE27 0BY
Received
24 Oct 2025
Validated
30 Oct 2025
Ward
Shiremoor
Parish
Whitley Bay
Case officer
Show
Target decision
25 Dec 2025
Decision
Application Permitted
Decision date
3 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Agent
North Tyneside Council
Leaseholder
Show

How this decision compares

Decided in 34 days from validation, 18 days faster than North Tyneside's median of 52 for signs and adverts. Approved, as 98% of signs and adverts here are.

100%decided within 8 weeks
98%approved
42decided in the last year

Plota live figures for signs and adverts decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Public comments

No public comments yet.

Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
Email
Consultation
4 Nov 2025
Comments by
2 Dec 2025
Site or press notice
11 Nov 2025
Statutory expiry
25 Dec 2025
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 overall
Relevant to this application:
Other decisions

North Tyneside is faster than most councils at deciding householder applications: #35 of 296 on speed. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.