Development Site Chase Farm Arnold Lane Gedling Nottinghamshire Data via plota.co.uk

2026/0620DOC - Approval of detail reserved by condition Awaiting decision

Proposal

Drainage Drawings, AMS, TPP, Phase 1 Ecology Survey, Dingy Skipper Survey, Bat Survey Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Sept 2026
✓
Consultation
16 Sept 2026
Decision
Expected by 2 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 2 Nov 2026.

The consultation period closed on 7 Oct 2026.

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Local nature reserve 110 m away: Gedling Country Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Recorded mine shaft 44 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gedling - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gedling
Application type
Approval of detail reserved by condition
Received
7 Sept 2026
Validated
7 Sept 2026
Ward
Gedling Ward 2015
Case officer
Show
Target decision
2 Nov 2026
Applicant
Show

Consultation & key dates

Alt. reference
PP-15195807
Planning Portal ref
PP-15195807
Consultation
16 Sept 2026
Comments by
7 Oct 2026
Statutory expiry
2 Nov 2026
Env. assessment
No
Gedling
Planning Authority Score
5.5/10
Average
#119 of 296 councils
Relevant to this application:
Major dwellings

Gedling ranks #162 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Gedling decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #37 of 296
95%
Householder approved
Above avg (90%) #77 of 296
62%
Decided in 8 weeks
Below avg (63%) #162 of 296
42%
Extended time limit
Above avg (41%) #164 of 296
86%
Minor dwellings approved
37 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
92%
Change of use approved
37 decided
415
Total decisions
26 refused in the year to March 2026