STAR ENERGY WEALD BASIN LTD Farnham Road Froyle Alton Hampshire GU34 4JD Data via plota.co.uk

SDNP/26/04201/ADJAUT - Adjoining Authority Consultation Decided

Proposal

Adjoining Authority Consultation - East Hampshire District Council () - Removal of existing structures, erection of workshop/office building for flexible use within use classes B2 and/or E, construction of wash bay, laying of concrete apron and use of the remainder of the site for open storage (class B8), together with access, parking and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
Decision
Target date was 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 15 Dec 2026 and 30 Dec 2026, from South Downs's recent commercial and major works.

Site constraints 4

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 135 m away: Southampton to London Pipeline Project
The site is about 135 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Adjoining Authority Consultation
Postcode
GU34 4JD
Received
20 Oct 2026
Validated
20 Oct 2026
Ward
Midhurst Ward CH
Parish
Midhurst Town Council
Case officer
Show
Target decision
10 Nov 2026
Decision level
SDNPA Delegated Decision
Applicant
Show

Decision outlook

Day 34 of the 56-day target. South Downs usually decides commercial and major works by day 62.

Day 3428 days to the predicted decision (day 62)
45%decided within 8 weeks
88%approved
77decided in the last year

Plota live figures for commercial and major works decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Nov 2026
Env. assessment
No