6 Purdysburn Village, Belfast, BT8 8LJ Data via plota.co.uk

LA05/2026/0640/LBC - Listed Building Consent Site Inspection Complete

Proposal

The proposed development comprises minor repairs, alterations, and landscape improvements to the Grade B2 listed cottage to enhance functionality, accessibility, and long-term durability while preserving its architectural character and historic significance. The works include external landscaping improvements, repair and replacement of existing building elements, installation of new timber windows and French doors, roof repairs, removal of redundant services. All works have been carefully designed to be sympathetic to the existing building fabric, materials, and detailing, ensuring the listed character and appearance of the property are retained. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Consultation
14 Aug 2026
Decision
Expected by 1 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 9 Oct 2026 and 4 Nov 2026, from Lisburn and Castlereagh's recent extensions.

The consultation period closed on 28 Aug 2026.

Site constraints 1

Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lisburn and Castlereagh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
BT8 8LJ
Received
6 Aug 2026
Validated
6 Aug 2026
Ward
Drumbo
Applicant
Show
Agent
Roger Perrott

Decision outlook

Day 64 of the 56-day target. Lisburn and Castlereagh usually decides extensions by day 74.

Day 6410 days to the predicted decision (day 74)
26%decided within 8 weeks
100%approved
133decided in the last year

Plota live figures for extensions decided by Lisburn and Castlereagh in the last twelve months, from validation. Lisburn and Castlereagh decision record →

Consultation & key dates

Planning Portal ref
PP-15131216
Consultation
14 Aug 2026
Comments by
28 Aug 2026
Site or press notice
14 Aug 2026