Royal National Theatre South Bank London SE1 9PX Data via plota.co.uk

25/02725/LB - Listed Building Consent Approved

Proposal

Application for Listed Building Consent in relation to internal works at the Lyttelton and Olivier auditoria corridors, and areas of the main foyers, including: replacement of ceilings throughout the Olivier and Lyttelton theatres' corridors and in limited areas within the main foyers; replacement of the original 1976 wiring within the Olivier and Lyttelton auditoria corridors and main foyer; replacement lighting within the Olivier and Lyttelton auditoria corridors and main foyer; removal and replacement of selected existing doors and wenge overpanels within Olivier and Lyttelton auditoria corridors; installation of two new fire doors at the circle level of the Olivier auditorium; installation of access control to auditoria entrance doors within Olivier and Lyttelton auditoria corridors and areas of the main foyer; replacement of hessian wall linings within Olivier and Lyttelton auditoria corridors; and other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Aug 2025
✓
Approved
23 Oct 2025

Approved on 23 Oct 2025 · Delegated Decision · Last checked 14 Oct 2026

Documents 29

Plans & drawings 19

PDF EXISTING DRAWINGS THIRD FLOOR CEILING FINISHED Plans · 28 Aug 2025 View ↗ PDF EXISTING DRAWINGS FOURTH FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 4 (LYT) SECOND FLOOR PLAN Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 5 (OLI) FOURTH FLOOR PLAN Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 4 (LYT) GROUND FLOOR PLAN Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 4 (LYT) THIRD FLOOR PLAN Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 5 (OLI) NEW DOOR DETAILS 01 Plans · 28 Aug 2025 View ↗ PDF EXISTING DRAWINGS GROUND FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS FOURTH FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS PACKAGE 5 (OLI) SIXTH FLOOR Plans · 28 Aug 2025 View ↗ PDF THE LOCATION PLAN OS Map · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS GROUND FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF EXISTING DRAWINGS SECOND FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF EXISTING DRAWINGS SIXTH FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS THIRD FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS FIFTH FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS SECOND FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS SIXTH FLOOR CEILING FINISHES Plans · 28 Aug 2025 View ↗ PDF PROPOSED DRAWINGS TYPICAL EXISTING DOOR WITH NEW ACCESS CONTROL Plans · 28 Aug 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 11

Grade II* listed: Royal National Theatre
List entry 1272324 · The pin is inside its outline · 4 more listed buildings within 150 m (1 Grade II*, 3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
South Bank conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 102 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Southbank
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Lambeth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lambeth
Application type
Listed Building Consent
Postcode
SE1 9PX
Received
28 Aug 2025
Validated
28 Aug 2025
Ward
Waterloo & South Bank
Case officer
Show
Target decision
23 Oct 2025
Decision
Grant Permission
Decision date
23 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Quod
Leaseholder
Show

How this decision compares

Decided in 56 days from validation, 6 days faster than Lambeth's median of 62 for listed building works. Approved, as 78% of listed building works here are.

35%decided within 8 weeks
78%approved
198decided in the last year

Plota live figures for listed building works decided by Lambeth in the last twelve months, from validation. Lambeth decision record →

Public comments

1comment received
1 supporting

2 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
7 Oct 2025
Statutory expiry
23 Oct 2025
Env. assessment
No
Lambeth
Planning Authority Score
2.7/10
Poor
#242 of 296 councils
Relevant to this application:
Other decisions

Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lambeth decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #274 of 296
81%
Householder approved
Below avg (90%) #273 of 296
62%
Decided in 8 weeks
Below avg (63%) #164 of 296
47%
Extended time limit
Above avg (41%) #209 of 296
46%
Minor dwellings approved
70 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
42%
Change of use approved
53 decided
1,784
Total decisions
396 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.