Cambridge Employment Park Development CB23 8HB Data via plota.co.uk

25/03511/SCOP - EIA Scoping Report Decided

Proposal

EIA Scoping Opinion request pursuant to Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for a proposed employment park. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2025
✓
Validated
11 Sept 2025
✓
EIA Scoping Report Issued
14 Oct 2025

EIA Scoping Report Issued on 14 Oct 2025 · Delegated Decision · Last checked 12 Oct 2026

Documents 27

All documents on the council site ↗

Site constraints 3

Public bridleway 0 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 578 m away: A14 Cambridge to Huntingdon Improvement Scheme
The site is 578 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA Scoping Report
Postcode
CB23 8HB
Received
8 Sept 2025
Validated
11 Sept 2025
Ward
Girton
Parish
Girton CP
Case officer
Show
Target decision
16 Oct 2025
Decision
EIA Scoping Report Issued
Decision date
14 Oct 2025
Decision level
Delegated Decision
Agent
SLR Consulting Limited

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
16 Oct 2025
Env. assessment
No
South Cambridgeshire
Planning Authority Score
8.1/10
Excellent
#25 of 296 overall
Relevant to this application:
Householder decisions

South Cambridgeshire is one of the fastest councils in England for householder decisions: #24 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
South Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #45 of 296
95%
Householder approved
Above avg (90%) #91 of 296
84%
Decided in 8 weeks
Above avg (63%) #24 of 296
31%
Extended time limit
Below avg (41%) #60 of 296
86%
Minor dwellings approved
215 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
79%
Change of use approved
38 decided
1,509
Total decisions
96 refused in the year to March 2026