Land At Badsell Farm Badsell Road Maidstone Road Paddock Wood TN12 6QR Data via plota.co.uk

26/502314/ADJ - Adjoining Authority Consultation Awaiting decision

Proposal

Adjoining Authority Consultation between Tunbridge Wells Borough Council and Maidstone Borough Council: Hybrid Planning Application - Full Application for 272 dwellings and access from Badsell Road and Maidstone Road. Outline Application (appearance, landscaping, layout and scale reserved) for approximately 248 dwellings , inclusive of associated infrastructure including a local centre, play areas, network of new roads, surface water drainage features, car and cycle parking, open space and associated Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jun 2026
Decision
Target date was 6 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 161.

Site constraints 5

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Local nature reserve 191 m away: Foal Hurst Wood
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Maidstone - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Maidstone
Application type
Adjoining Authority Consultation
Postcode
TN12 6QR
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
Outside All Boroughs
Parish
Outside All Boroughs
Case officer
Show
Target decision
6 Jul 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 161, past the statutory target. 82% of commercial and major works in Maidstone are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 16170 days past the 91-day target
58%decided within 8 weeks
76%approved
7%go to committee

Plota live figures for commercial and major works decided by Maidstone in the last twelve months, from validation. Maidstone decision record →

Consultation & key dates

Alt. reference
26/01233/HYBRID
Statutory expiry
6 Jul 2026
Env. assessment
No
Maidstone
Planning Authority Score
7.1/10
Good
#58 of 296 overall
Relevant to this application:
Major dwellings

Maidstone is faster than most councils at deciding householder applications: #34 of 296 on speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Maidstone decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #225 of 296
91%
Householder approved
Above avg (90%) #175 of 296
81%
Decided in 8 weeks
Above avg (63%) #34 of 296
30%
Extended time limit
Below avg (41%) #55 of 296
76%
Minor dwellings approved
136 decided (1-9 homes)
75%
Major dwellings approved
20 decided (10+ homes)
75%
Change of use approved
44 decided
1,110
Total decisions
181 refused in the year to March 2026