Stable Family Home Trust, The Stables, Christchurch Road, Bisterne, Ringwood BH24 3BN Data via plota.co.uk

26/00945FULL - Full Application Site Visit

Proposal

Cabin Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Aug 2026
✓
Validated
18 Sept 2026
✓
Consultation
28 Sept 2026
Decision
Expected by 23 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 7 Nov 2026, from New Forest (Park)'s recent full applications.

Comments are open until 2 Nov 2026

Comment on this application ↗

Site constraints 8

Aerodrome safeguarding zone
Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 365 m away: Navitus Bay Wind Park
The site is 365 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Wood pasture and parkland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Priority habitat 14 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
BH24 3BN
Received
28 Aug 2026
Validated
18 Sept 2026
Parish
Ringwood Town Council
Case officer
Show
Target decision
23 Oct 2026
Applicant
Show
Agent
People Architects

Decision outlook

Day 21 of the 56-day target. New Forest (Park) usually decides full applications by day 50.

Day 2135 days to the 56-day target
78%decided within 8 weeks
92%approved
85%go to committee

Plota live figures for full applications decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
PP-15189181
Comments by
2 Nov 2026
Site or press notice
28 Sept 2026
Statutory expiry
2 Nov 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 councils
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications, ranking #254 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026