91 Crescent Drive North Brighton BN2 6SL Data via plota.co.uk

BH2026/02413 - Lawful Development Certificate Proposed Registered

Proposal

Certificate of lawfulness for proposed erection of single storey ground floor rear extension. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 21 Dec 2026, from Brighton and Hove's recent extensions.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National park 143 m away: South Downs; Radon affected area, class 3; Special area of conservation 395 m away: Castle Hill; SSSI 395 m away: Castle Hill SSSI; Inside the Brighton and Hove built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area117 m² (1,259 sq ft)
Energy ratingD (64 out of 100), could reach C
PropertyDetached house, 4 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in July 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Brighton and Hove - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Lawful Development Certificate Proposed
Postcode
BN2 6SL
Received
26 Oct 2026
Validated
26 Oct 2026
Ward
Woodingdean
Case officer
Show
Target decision
21 Dec 2026
Applicant
Show
Agent
Shear Architectural Design

Decision outlook

Day 28 of the 56-day target. Brighton and Hove usually decides extensions by day 56.

Day 2828 days to the 56-day target
55%decided within 8 weeks
96%approved
886decided in the last year

Plota live figures for extensions decided by Brighton and Hove in the last twelve months, from validation. Brighton and Hove decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
7 Dec 2026
Site or press notice
9 Nov 2026
Statutory expiry
21 Dec 2026
Env. assessment
No
Brighton and Hove
Planning Authority Score
4.3/10
Below average
#185 of 296 overall
Relevant to this application:
Householder decisions

Brighton and Hove is slower than most councils at deciding householder applications: #238 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brighton and Hove decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #107 of 296
95%
Householder approved
Above avg (90%) #70 of 296
50%
Decided in 8 weeks
Below avg (63%) #238 of 296
46%
Extended time limit
Above avg (41%) #200 of 296
71%
Minor dwellings approved
189 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
63 decided
1,719
Total decisions
176 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.