Land east of Showell Farm, Chippenham, Wiltshire Data via plota.co.uk

PL/2026/03545 - Outline planning permission Submitted

Proposal

Outline Planning Application for up to 400 dwellings (Class C3 use), land for a Local Centre, accommodating commercial, business and service uses (Class E use), drinking establishment and hot food takeaway (Sui Generis); and local community uses (Class F2); open space and landscaping to include natural green space, amenity green space, area of formal play, allotments and community orchard, sustainable drainage infrastructure and ground remodelling. All matters reserved except for the formation of a new vehicular access and cycle and pedestrian access including emergency access onto the B4528. Data via plota.co.uk

View original council record ↗

Application progress

Received
4 Jun 2026
Validated
4 Jun 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 114

Statements & assessments 85

PDF PL 2026 03545 Drainage Response Issue PDF · 14 Jul 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.1 - IAQM Construction Methodology Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.1 - Study Area and Highway Links Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3c - Proposed Habitat Conditions Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 2.2 - Cumulative Sites Assessment Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.6 - Construction Dust Mitigation Measures Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.5 - Model Verification Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 1.1 - Site Location Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.2 - Landscape and Visual Effects Statements · 4 Jun 2026 View ↗ PDF Design & Access Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.3 - Framework Travel Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.1 - Archaeological Desk Based Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 4.1 - Facilities Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 1 - Main Text Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3b - Indicative Biodiversity Net Gain Metric Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.4a - Arboricultural Baseline Note Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 2.1 - Parameter and Site Access Plans Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.3 Figures Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.1 - Heritage Impact Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.5 - Ecological Parameters Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.3 - Cumulative Effects Statements · 4 Jun 2026 View ↗ PDF Sustainability, Energy and Waste Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.1 - Ecological Baseline Report Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.1 - Landscape and Visual Impact Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.4b - Arboricultural Impact Asssessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3a - Indicative Biodiversity Net Gain Feasibility Report Statements · 4 Jun 2026 View ↗ PDF Noise Assessment Report · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 1 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.2 Traffic Data Statements · 4 Jun 2026 View ↗ PDF Odour Assessment Report · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 2 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.2 - List Entry Descriptions Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.2 - Shadow Habitat Regulation Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.3 - Heritage Asset Plan Statements · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 3 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendices Cover Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 11.1 - Flood Risk Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.2 - Geophysical Survey Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.4 - Model Input Parameters Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 3: Non-technical Summary Statements · 4 Jun 2026 View ↗ PDF Planning Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.3 - Archaeological Evaluation Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.2 Transport Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.1 - IAQM Construction Methodology Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.1 - Study Area and Highway Links Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3c - Proposed Habitat Conditions Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 2.2 - Cumulative Sites Assessment Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.6 - Construction Dust Mitigation Measures Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.5 - Model Verification Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 1.1 - Site Location Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.2 - Landscape and Visual Effects Statements · 4 Jun 2026 View ↗ PDF Design & Access Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.3 - Framework Travel Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.1 - Archaeological Desk Based Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 4.1 - Facilities Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 1 - Main Text Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3b - Indicative Biodiversity Net Gain Metric Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.4a - Arboricultural Baseline Note Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 2.1 - Parameter and Site Access Plans Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.3 Figures Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.1 - Heritage Impact Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.5 - Ecological Parameters Plan Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.3 - Cumulative Effects Statements · 4 Jun 2026 View ↗ PDF Sustainability, Energy and Waste Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.1 - Ecological Baseline Report Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 7.1 - Landscape and Visual Impact Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.4b - Arboricultural Impact Asssessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.3a - Indicative Biodiversity Net Gain Feasibility Report Statements · 4 Jun 2026 View ↗ PDF Noise Assessment Report · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 1 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.2 Traffic Data Statements · 4 Jun 2026 View ↗ PDF Odour Assessment Report · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 2 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.2 - List Entry Descriptions Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 8.2 - Shadow Habitat Regulation Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 9.3 - Heritage Asset Plan Statements · 4 Jun 2026 View ↗ PDF Preliminary Risk Assessment - Part 3 Report · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendices Cover Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 11.1 - Flood Risk Assessment Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.2 - Geophysical Survey Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 6.4 - Model Input Parameters Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 3: Non-technical Summary Statements · 4 Jun 2026 View ↗ PDF Planning Statement Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 10.3 - Archaeological Evaluation Statements · 4 Jun 2026 View ↗ PDF Environmental Statement - Volume 2 - Appendix 5.2 Transport Assessment Statements · 4 Jun 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Wiltshire - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
Wiltshire
Application type
Outline planning permission
Postcode
SN15 2NU
Received
4 Jun 2026
Validated
4 Jun 2026
Ward
Chippenham Lowden & Rowden ED;Chippenham Pewsham ED;Corsham Without ED
Parish
Chippenham CP;Lacock CP
Case officer
Show
Target decision
24 Sept 2026

Public comments

20comments received
8 objecting11 neutral1 supporting

40% object · below the UK average of 76%

Last counted 21 Aug 2026

Read the comments on the council site ↗

Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Major dwellings

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision performance
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026