Replacement outbuilding at 2 Green Field, Darwen

Summary of planning committee decision

Decided by Blackburn Planning and Highways Committee on 15 Jan 2026.

10/25/0801Approved

What was proposed

The application sought retrospective permission for a replacement outbuilding in the rear garden, measuring 5 metres deep, 6.7 metres wide and up to 2.72 metres high.

“A retrospective planning application was first submitted to the Local Planning Authority in March 2025. The application reference for this application was 10/25/0248. After an assessment against the relevant adopted Development Plan Policies along with the NPPF the application was subsequently refused planning permission (see Section 5).”

“The proposal relates to a householder planning application for: ‘Replacement Outbuilding’.. The proposed garden room/outbuilding has a depth of 5m and measures 6.7m wide. At its highest point the garden room/outbuilding measures 2.72m and comprises of a sloping flat roof.”

Officer report

The site and its setting

The site is a two-storey detached house with gardens, a driveway and garage in an urban residential development where permitted development rights were removed.

“The application site relates to a two-storey detached dwellinghouse positioned to the southern side of Green Field, Darwen. The host dwelling comprises of garden areas to the front and rear, driveway and detached garage.”

“The property is part of the relatively new build development granted permission in 2012 (10/12/0933) for the Outline Planning Approval of up to 133 dwellings. Condition no. 19 on the planning approval removed permitted development rights for Classes A-F, Part 1 of the General Permitted Development Order (GPDO). The erection of an outbuilding falls under Class E and this is why planning permission is required.”

Officer report

Earlier applications and changes

An earlier retrospective outbuilding application was refused in May 2025, followed by pre-application discussions and amended plans for the current application.

“The current application being presented to Committee was submitted in August 2025 for the ‘Replacement Outbuilding’. Since the submission of the application further discussions have been held between the case officer and the applicant’s agent, and further amended plans have been submitted.”

Officer report

Conditions proposed

The proposed conditions controlled the construction timetable, approved plans and materials, ancillary use, commercial activity and drainage arrangements.

“The development hereby approved shall be implemented in accordance with the timetable of works received on the 19 th December 2025, entitled “Proposed Construction Programme”, works to commence week commencing 23 rd February 2026.”

“The proposed drainage should be implemented in complete accordance with the Proposed Site Plan A304 and Existing and Propose Elevations A305 received on the 16/12/2025. The approved system shall be retained and maintained for the lifetime of the development.”

Officer report

The committee’s decision

Planning permission was granted subject to the conditions highlighted in the Director’s report.

“Decision under Town and Country Planning Acts and Regulations –”

“That planning permission be granted subject to the conditions highlighted in the Director’s report.”

Minutes

Sources

  • Blackburn Planning and Highways Committee minutes, 15 January 2026
  • Agenda and papers (council website)

Source: Plota analysis of Blackburn's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Blackburn
Date
Thursday 15 January 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

40 decisions in the 12 months to this meeting.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →