Bridge Farm Thoresby Bridge Marshchapel Lincolnshire DN36 5TY Data via plota.co.uk

00834/26/DPC - Discharge of Planning Conditions Decided

Proposal

Discharge of condition 3 (bat surveys), condition 4 (historic building recording), condition 8 (contamination phase 1), condition 9 (remediation strategy and works), and condition 10 (validation report) imposed on Planning Permission ref. no. . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 May 2026
✓
Responded
4 Aug 2026

Responded on 4 Aug 2026 · Last checked 2 Sept 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3, 4, 8, 9, 10 decided (outcome not recorded)

    • ConditionsDischarge of condition 3 (bat surveys), condition 4 (historic building recording), condition 8…This application00834/26/DPC

Site constraints 8

Grade II listed: Warehouse at Thoresby Bridge
List entry 1168140 · 9 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Priority Rivers
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1537 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two; Flood defence 13 m away (wall, designed for a 1 in 100 year flood); Priority habitat 28 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area614 m² (6,609 sq ft)
Energy ratingG (asset rating 183)
UseB8 Storage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Postcode
DN36 5TY
Received
19 May 2026
Validated
19 May 2026
Ward
Tetney Ward
Parish
North Cotes
Case officer
Show
Target decision
14 Jul 2026
Decision
Responded
Decision date
4 Aug 2026
Applicant
Show
Agent
Turton Associates

Public comments

No public comments yet.

Last counted 2 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14942374
Planning Portal ref
PP-14942374
Comments by
19 Jun 2026
Statutory expiry
14 Jul 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.