Long Island Bittesby Way Magna Park Bittesby Leicestershire LE17 4YQ Data via plota.co.uk

26/01613/PCD - Planning Condition Discharge Pending Consideration

Proposal

Discharge of condition 19 (Surface Water Maintenance) of Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
Decision
Expected by 31 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 31 Dec 2026.

Comments are open until 10 Dec 2026

Comment on this application ↗

Associated applications 11

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 736 m away: Hinckley National Rail Freight Interchange
The site is 736 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat 20 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Harborough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harborough
Application type
Planning Condition Discharge
Postcode
LE17 4YQ
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Ullesthorpe
Parish
Bitteswell With Bittesby
Case officer
Show
Target decision
31 Dec 2026
Applicant
Show
Agent
Louise Steele - Frampton Town Planning Limited

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15170919
Planning Portal ref
PP-15170919
Comments by
10 Dec 2026
Statutory expiry
31 Dec 2026
Env. assessment
No
Harborough
Planning Authority Score
4.2/10
Below average
#187 of 296 overall
Relevant to this application:
Householder decisions

Harborough is slower than most councils at deciding householder applications: #230 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Harborough decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #131 of 296
92%
Householder approved
Above avg (90%) #155 of 296
51%
Decided in 8 weeks
Below avg (63%) #230 of 296
38%
Extended time limit
Below avg (41%) #128 of 296
74%
Minor dwellings approved
96 decided (1-9 homes)
67%
Major dwellings approved
12 decided (10+ homes)
76%
Change of use approved
50 decided
814
Total decisions
90 refused in the year to March 2026