Lochgoilhead Bridge Lochgoilhead Argyll And Bute Data via plota.co.uk

2026/0279/LBC - Listed Building Consent Current

Proposal

Bridge strengthening works, masonry repairs, new road surfacing and increasing height of existing parapets. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Consultation
13 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Feb 2027 and 6 Apr 2027, from Loch Lomond's recent listed building works.

Documents 25

All documents on the council site ↗

Site constraints 2

Grade B listed: Lochgoilhead Bridge
List entry LB11813 · 2 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic Environment Scotland ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Not affected
No scheduled monument at the site

Checked on 14 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Loch Lomond - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Received
6 Nov 2026
Validated
6 Nov 2026
Ward
Cowal Ward
Parish
Lochgoil CC
Case officer
Show
Target decision
5 Jan 2027
Decision level
Delegated Decision
Applicant
Show
Agent
Argyll & Bute Council

Decision outlook

Day 17 of the 56-day target. Loch Lomond usually decides listed building works by day 112.

Day 1795 days to the predicted decision (day 112)
4%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for listed building works decided by Loch Lomond in the last twelve months, from validation. Loch Lomond decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100775173-001
Consultation
13 Nov 2026
Site or press notice
26 Nov 2026
Statutory expiry
5 Jan 2027
Env. assessment
No