Nuffield Health Hereford Hospital 2 Venns Lane Hereford Herefordshire HR1 1DF Data via plota.co.uk

P263151/F - Planning Permission Valid

Proposal

Substation in a prefabricated GRP housing and loose gravel access path. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 10 Dec 2026; it is now day 31.

Comments are open until 10 Dec 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Aylestone Hill conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 386 m away: Broadlands; Radon affected area, class 3; 3 listed buildings within 150 m; Inside the Hereford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Postcode
HR1 1DF
Received
23 Oct 2026
Validated
23 Oct 2026
Ward
Holmer
Parish
Hereford
Target decision
18 Dec 2026

Decision outlook

Day 31, past Herefordshire's usual 15 days for utility and infrastructure works. 88% are decided within thirteen weeks, so most likely by 22 Jan 2027.

Day 3125 days to the 56-day target
78%decided within 8 weeks
94%approved
166decided in the last year

Plota live figures for utility and infrastructure works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
9 Nov 2026
Comments by
10 Dec 2026
Site or press notice
9 Nov 2026
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Householder decisions

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026