8 Stephen Street South, Bury, BL8 2NT Data via plota.co.uk

72425 - Full Approved

Proposal

Change of use from existing 6 bedroom (single occupancy) HMO to 6 bedroom (6-8 occupants) HMO (House in Multiple Occupation) (Use Class Sui Generis) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2025
✓
Consultation
21 Oct 2025
✓
Approved
19 Dec 2025

Approved on 19 Dec 2025 · Planning Committee · Last checked 7 Nov 2026

Planning committee

Decided by Bury Planning Control Committee on 16 Dec 2025.

Approved

As officers recommended.

  • Officers advised approval because two extra occupants would not cause demonstrable harm compared with the lawful six-person HMO.
  • Residents raised concerns about noise, disruption, parking pressure and harm to the quiet character of the cul-de-sac.
  • The committee approved the change of use with conditions in accordance with the reasons put forward by the Development Manager.
Read how the committee decided The proposal, site, officer assessment, objections, consultation responses and committee decision.

Source: Plota analysis of Bury's committee minutes of 16 Dec 2025.

Site constraints 5

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Article 4 direction
Bury borough HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Radon affected area, class 3; Inside the Bury (Bury) built-up area; Air quality management area 52 m away: Bury AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £180,000 in December 2024. Terraced house, leasehold.

20 December 2024£180,000Recorded as a transfer outside a standard sale
22 August 2007£150,000
22 December 2006£75,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area156 m² (1,679 sq ft)
Energy ratingC (74 out of 100), could reach B
PropertyEnd-terrace house, 6 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, with internal insulation

From the energy performance certificate lodged in May 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bury
Application type
Full
Postcode
BL8 2NT
Received
30 Sept 2025
Validated
30 Sept 2025
Ward
Bury West
Case officer
Show
Target decision
19 Dec 2025
Decision
Approve with Conditions
Decision date
19 Dec 2025
Decision level
Planning Committee
Applicant
Show
Agent
Invest Multilet & PPB Ltd
Leaseholder
Show

How this decision compares

Decided in 80 days from validation, 31 days slower than Bury's median of 49 for full applications. Approved, as 89% of full applications here are.

75%decided within 8 weeks
89%approved
680decided in the last year

Plota live figures for full applications decided by Bury in the last twelve months, from validation. Bury decision record →

Public comments

3comments received
3 objecting

100% object · above the UK average of 74%

24 neighbours consulted · Last counted 7 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14372016
Planning Portal ref
PP-14372016
Neighbours
8 Dec 2025
Consultation
21 Oct 2025
Comments by
14 Nov 2025
Site or press notice
24 Oct 2025
Committee
16 Dec 2025
Statutory expiry
25 Nov 2025
Env. assessment
No
Bury
Planning Authority Score
7.5/10
Good
#41 of 296 overall
Relevant to this application:
Change of use

Bury is faster than most councils at deciding householder applications: #61 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bury decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #191 of 296
94%
Householder approved
Above avg (90%) #99 of 296
76%
Decided in 8 weeks
Above avg (63%) #61 of 296
32%
Extended time limit
Below avg (41%) #64 of 296
59%
Minor dwellings approved
61 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
79%
Change of use approved
63 decided
757
Total decisions
109 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.