Land at rear of Plot 6, Llys Y Nant, Llanfynydd Data via plota.co.uk

PL/11446 - Full planning permission Under Consultation

Proposal

Agricultural implement and fodder storage building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
30 Sept 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Oct 2026 and 18 Nov 2026, from Carmarthenshire's recent agricultural works.

Comments are open until 22 Oct 2026

Comment on this application ↗

Site constraints 4

Nutrient neutrality catchment: River Tywi
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Received
18 Sept 2026
Validated
30 Sept 2026
Ward
Llanegwad
Parish
Llanfynydd
Case officer
Show
Target decision
25 Nov 2026

Decision outlook

Day 9 of the 56-day target. Carmarthenshire usually decides agricultural works by day 34.

Day 947 days to the 56-day target
65%decided within 8 weeks
86%approved
87decided in the last year

Plota live figures for agricultural works decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
22 Oct 2026