6 Torbay Farm Upham Southampton Hampshire SO32 1QN Data via plota.co.uk

26/00226/MLA - Modify Legal Agreement Approved

Proposal

Vary or modify a S106 legal agreement (case no and ) (Second Schedule Part 1) relating to Staircasing restriction on shared ownership homes. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Dec 2025
✓
Validated
12 Feb 2026
✓
Approved
11 May 2026

Approved on 11 May 2026 · Delegated Decision · Last checked 24 Sept 2026

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 188 m away: Hampshire Water Transfer and Water Recycling Project
The site is 188 m from the project boundary. Dam or reservoir, accepted for examination. Also within 2 km: Southampton to London Pipeline Project (decided, 1.5 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National park 34 m away: South Downs
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
Inside the Upham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area72 m² (775 sq ft)
Energy ratingB (81 out of 100)
PropertySemi-detached house
Built2016
HeatingBoiler and radiators, LPG
WallsAverage thermal transmittance 0.25 W/m²K

From the energy performance certificate lodged in July 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Modify Legal Agreement
Postcode
SO32 1QN
Received
17 Dec 2025
Validated
12 Feb 2026
Ward
UPPER MEON VALLEY WARD
Parish
Upham Parish Council
Case officer
Show
Target decision
14 May 2026
Decision
Application Permitted
Decision date
11 May 2026
Decision level
Delegated Decision
Applicant
Show

Consultation & key dates

Statutory expiry
14 May 2026
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 overall
Relevant to this application:
Householder decisions

Winchester is slower than most councils at deciding householder applications: #213 of 296 on speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.