32 Kingswood Close Boldon Colliery NE35 9LG Data via plota.co.uk

250351 - Householder Full Application Approved

Proposal

Enlarge first floor rear bedroom window. Block up existing side window to bedroom Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2025
✓
Approved
23 Jul 2025

Approved on 23 Jul 2025 · Last checked 17 Nov 2026

Site constraints 6

National infrastructure project about 353 m away: A19 / A184 Testos Junction Improvement
The site is about 353 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Local nature reserve about 401 m away: Station Burn; 1 listed building within 150 m of the postcode pin; Coalfield, development low risk area; Inside the Boldon Colliery built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Full Application
Postcode
NE35 9LG
Received
29 May 2025
Validated
29 May 2025
Ward
Boldon Colliery
Case officer
Show
Decision
Grant Permission Householder with Conditions
Decision date
23 Jul 2025
Applicant
Show
Agent
Gary Craig Architectural Services Ltd

How this decision compares

Decided in 55 days from validation, 5 days slower than South Tyneside's median of 50 for householder applications. Approved, as 99% of householder applications here are.

71%decided within 8 weeks
99%approved
206decided in the last year

Plota live figures for householder applications decided by South Tyneside in the last twelve months, from validation. South Tyneside decision record →

Consultation & key dates

Comments by
27 Jun 2025
Statutory expiry
24 Jul 2025
South Tyneside
Planning Authority Score
5.9/10
Average
#108 of 296 overall
Relevant to this application:
Householder decisions

South Tyneside is #154 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Tyneside decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #92 of 296
98%
Householder approved
Above avg (90%) #24 of 296
64%
Decided in 8 weeks
Above avg (63%) #154 of 296
44%
Extended time limit
Above avg (41%) #186 of 296
88%
Minor dwellings approved
8 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
58%
Change of use approved
48 decided
396
Total decisions
32 refused in the year to March 2026