26/10913/HHNOT - Prior Approval Householder Extensions Approved

Proposal

Erection of a single storey extension to rear extending 6m beyond the rear wall of the original house, maximum height 4m high and 2m to eaves Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Aug 2026
✓
Consultation
9 Sept 2026
✓
Approved
9 Sept 2026

Approved on 9 Sept 2026 · Delegated Decision · Last checked 10 Sept 2026

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 1069 m away: Dogger Bank Creyke Beck
The site is 1069 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Peartree Hill Solar Farm (decided, 1157 m); East Coast Hydrogen Humber Pipeline (at pre-application, 796 m); Dogger Bank D Wind Farm (at pre-application, 1850 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Woodmansey built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £250,000 in April 2026. Semi-detached house, freehold.

9 April 2026£250,000
11 December 2019£171,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area76 m² (818 sq ft)
Energy ratingE (42 out of 100), could reach C
PropertySemi-detached bungalow, 3 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval Householder Extensions
Postcode
HU17 0RR
Received
4 Aug 2026
Validated
4 Aug 2026
Ward
Minster And Woodmansey
Parish
Woodmansey Parish Council
Case officer
Show
Target decision
15 Sept 2026
Decision
Prior Approval Not Required
Decision date
9 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Awesome Proportions Limited

How this decision compares

Decided in 36 days from validation, 17 days faster than East Riding's median of 53 for extensions. Approved, as 88% of extensions here are.

97%decided within 8 weeks
88%approved
748decided in the last year

Plota live figures for extensions decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

1comment received
1 neutral

3 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15133683
Planning Portal ref
PP-15133683
Neighbours
9 Sept 2026
Consultation
9 Sept 2026
Comments by
26 Aug 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.