8 Teapot Row Clocktower Drive Southsea PO4 9YA Data via plota.co.uk

26/01279/FUL - Full Application Awaiting decision

Proposal

Replacement front entrance stairs Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from Portsmouth's recent extensions.

Site constraints 8

Grade II listed: Former Eastney House, Linking Archway and Railings Teapot Row
List entry 1387085 · 17 m away · 5 more listed buildings within 150 m (5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Historic England ↗
Eastney Barracks conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Scheduled monument 25 m away: Eastney forts and perimeter defences of barracks
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Special protection area 218 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 812 m away: AQUIND Interconnector
The site is 812 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 939 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO4 9YA
Received
3 Nov 2026
Validated
3 Nov 2026
Ward
Eastney & Craneswater
Target decision
29 Dec 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 20 of the 56-day target. Portsmouth usually decides extensions by day 55.

Day 2036 days to the 56-day target
62%decided within 8 weeks
85%approved
284decided in the last year

Plota live figures for extensions decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15341383
Planning Portal ref
PP-15341383
Statutory expiry
29 Dec 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 overall
Relevant to this application:
Householder decisions

Portsmouth is #188 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use