Telecommunications Pole WP1 Outside 7 And 8 Lightfoot Close Newark On Trent Data via plota.co.uk

26/01839/TELNOT - Notifications The Electronic Comms Code Pending

Proposal

Installation of 10m wooden pole. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Validated
9 Nov 2026
Decision
Expected by 7 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 5 Dec 2026, from Newark and Sherwood's recent utility and infrastructure works.

Site constraints 4

Scheduled monument about 93 m away: Civil War redoubt on Beacon Hill, 550m north west of The Firs
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Newark-on-Trent built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 14 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newark and Sherwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Notifications The Electronic Comms Code
Received
6 Nov 2026
Validated
9 Nov 2026
Ward
Beacon
Parish
Newark
Case officer
Show
Target decision
7 Dec 2026
Applicant
Show

Decision outlook

Day 9 of the 56-day target. Newark and Sherwood usually decides utility and infrastructure works by day 26.

Day 947 days to the 56-day target
86%decided within 8 weeks
100%approved
61decided in the last year

Plota live figures for utility and infrastructure works decided by Newark and Sherwood in the last twelve months, from validation. Newark and Sherwood decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
7 Dec 2026
Env. assessment
No
Newark and Sherwood
Planning Authority Score
3.9/10
Below average
#198 of 296 councils
Relevant to this application:
Householder decisions

Newark and Sherwood is slower than most councils at deciding householder applications, ranking #241 out of 296. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newark and Sherwood decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #88 of 296
96%
Householder approved
Above avg (90%) #55 of 296
50%
Decided in 8 weeks
Below avg (63%) #241 of 296
54%
Extended time limit
Above avg (41%) #244 of 296
80%
Minor dwellings approved
110 decided (1-9 homes)
88%
Major dwellings approved
25 decided (10+ homes)
82%
Change of use approved
33 decided
767
Total decisions
63 refused in the year to March 2026