Land Parcel Grimsby Road Laceby North East Lincolnshire Data via plota.co.uk

DM/0745/26/POW - Overhead lines(exemption reg) Pending Consideration

Proposal

Application under the Overhead Lines (Exemption) (England & Wales) Regulations 2009 - recover some poles and overhead conductors, convert two existing poles into terminal poles and add one stay wire to each pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 22 Sept 2026
✓
Consultation
1 Oct 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 16 Nov 2026 and 25 Nov 2026, from North East Lincs's recent full applications.

Comments are open until 25 Oct 2026

Comment on this application ↗

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 50 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 50 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 50 m); Grimsby to Walpole (at pre-application, 122 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, 1482 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead lines(exemption reg)
Received
around 22 Sept 2026
Validated
22 Sept 2026
Ward
Wold
Parish
Laceby Parish Council
Case officer
Show
Target decision
3 Nov 2026
Applicant
Show

Decision outlook

Day 17 of the 56-day target. North East Lincs usually decides full applications by day 56.

Day 1739 days to the 56-day target
55%decided within 8 weeks
95%approved
10%go to committee

Plota live figures for full applications decided by North East Lincs in the last twelve months, from validation. North East Lincs decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
1 Oct 2026
Comments by
25 Oct 2026
Statutory expiry
3 Nov 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026