1 The Parade Windmill Road Oxford Oxfordshire OX3 7BL Data via plota.co.uk

25/03253/FUL - Full Application Approved

Proposal

Upgrades and installation of ventilation system, ducting and associated works. Installation of an awning canopy to front elevation (amended plans). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2025
✓
Validated
15 Dec 2025
✓
Consultation
17 Dec 2025
✓
Approved
6 Mar 2026

Approved on 6 Mar 2026 · Delegated Decision · Last checked 3 Oct 2026

Licence at this address

Licensed hours are what the licence permits, not opening times.

Site constraints 6

Article 4 direction
Houses in Multiple Occupation Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: The City of Oxford
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Inside the Oxford built-up area; Conservation area about 95 m away: Old Headington.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Oxford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Oxford
Application type
Full Application
Postcode
OX3 7BL
Received
5 Dec 2025
Validated
15 Dec 2025
Ward
Headington Ward
Target decision
6 Mar 2026
Decision
Approved
Decision date
6 Mar 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 81 days from validation, 20 days slower than Oxford's median of 61 for full applications. Approved, as 87% of full applications here are.

45%decided within 8 weeks
87%approved
796decided in the last year

Plota live figures for full applications decided by Oxford in the last twelve months, from validation. Oxford decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14521638
Planning Portal ref
PP-14521638
Neighbours
17 Dec 2025
Consultation
17 Dec 2025
Comments by
7 Feb 2026
Site or press notice
8 Jan 2026
Statutory expiry
9 Feb 2026
Env. assessment
No
Oxford
Planning Authority Score
1.8/10
Poor
#277 of 296 overall
Relevant to this application:
Householder decisions

Oxford is slower than most councils at deciding householder applications: #261 of 296 on speed. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Oxford decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #159 of 296
89%
Householder approved
Below avg (90%) #205 of 296
43%
Decided in 8 weeks
Below avg (63%) #261 of 296
57%
Extended time limit
Above avg (41%) #259 of 296
61%
Minor dwellings approved
64 decided (1-9 homes)
100%
Major dwellings approved
5 decided (10+ homes)
75%
Change of use approved
117 decided
1,150
Total decisions
140 refused in the year to March 2026