Yorkshire Water Naburn Waste Water Treatment Works Naburn Lane Naburn York YO19 4RN Data via plota.co.uk

26/01625/FUL - Full Application Awaiting decision

Proposal

Installation of new site assets (kiosks and tanks) and critical infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
✓
Validated
9 Sept 2026
Decision
Expected by 4 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 29 Nov 2026, from York's recent commercial and major works.

Comments are open until 22 Oct 2026

Comment on this application ↗

Documents 31

Plans & drawings 19

PDF SITE LOCATION PLAN Location Plan · 8 Sept 2026 View ↗ PDF SITE LAYOUT PLAN SHEET 1 Drawing · 8 Sept 2026 View ↗ PDF SITE LAYOUT PLAN SHEET 2 Drawing · 8 Sept 2026 View ↗ PDF EXISTING SITE PLAN Drawing · 8 Sept 2026 View ↗ PDF FERRIC DOSING KIOSK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF WASHWATER BOOSTING KIOSK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF POLYMER BIG BAG KIOSKS PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF MAGNETITE DOSING KIOSK & MAGNETITE STORAGE TANK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF POLYMER DOSING KIOSK & POTABLE WATER BREAK TANK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF COMAG MCC KIOSK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF FERRIC STORAGE TANK GENERAL PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF TSR FEED PS MCC KIOSK & HIGH VOLTAGE KIOSK PLAN & ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 EXISTING GENERAL ARRANGEMENT PLAN Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 PROPOSED WEST & EAST ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 PROPOSED NORTH & SOUTH ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 EXISTING EAST & WEST ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF CENTRIFUGE TANK 5 EXISTING NORTH & SOUTH ELEVATIONS Drawing · 8 Sept 2026 View ↗ PDF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Report · 8 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 5

Green belt: York
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Inside the Bishopthorpe built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Full Application
Postcode
YO19 4RN
Received
8 Sept 2026
Validated
9 Sept 2026
Ward
Wheldrake
Case officer
Show
Target decision
4 Nov 2026
Applicant
Show
Agent
Arup

Decision outlook

Day 30 of the 56-day target. York usually decides commercial and major works by day 77.

Day 3047 days to the predicted decision (day 77)
39%decided within 8 weeks
77%approved
32decided in the last year

Plota live figures for commercial and major works decided by York in the last twelve months, from validation. York decision record →

Public comments

3comments received
3 neutral

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15185435
Planning Portal ref
PP-15185435
Comments by
22 Oct 2026
Statutory expiry
4 Nov 2026
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Householder decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026