Sewage Disposal Works New Street Chippenham Cambridgeshire Data via plota.co.uk

26/00812/CCA - County Council application Pending Consideration

Proposal

Extension to water recycling centre, including the erection of a chemical storage tank and dosing equipment, dosing system, emergency shower, sludge holding tank, kiosk, lighting, fencing, gates, parking area with hardstanding, vehicular access and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Consultation
30 Jul 2026
Decision
Expected by 23 Sept 2026

As of 22 Sept 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 594 m away: Sunnica Energy Farm
The site is 594 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Priority Rivers
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 47 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
County Council application
Received
29 Jul 2026
Validated
29 Jul 2026
Ward
Fordham And Isleham
Parish
Chippenham
Case officer
Show
Applicant
Show

Decision outlook

Day 72, past the statutory target. 92% of other in East Cambridgeshire are decided within thirteen weeks, which runs to 28 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 6 Sept 2026.

Day 7216 days past the 56-day target
76%decided within 8 weeks
96%approved
1,669decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in East Cambridgeshire to go on. East Cambridgeshire decision record →

Public comments

1comment received
1 objecting

Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
CCC/26/045/FUL
Consultation
30 Jul 2026
Comments by
13 Aug 2026
East Cambridgeshire
Planning Authority Score
6.1/10
Average
#97 of 296 councils
Relevant to this application:
Householder decisions

East Cambridgeshire is faster than most councils at deciding householder applications, ranking #65 out of 296. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #193 of 296
89%
Householder approved
Below avg (90%) #202 of 296
76%
Decided in 8 weeks
Above avg (63%) #65 of 296
34%
Extended time limit
Below avg (41%) #85 of 296
74%
Minor dwellings approved
124 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
87%
Change of use approved
30 decided
697
Total decisions
96 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use