Land Along A52, Leverton Data via plota.co.uk

B/26/0168 - Consultation to LPA Decided

Proposal

Exemption application under the Electricity Act 1989: The Overhead Lines (Exemption)(England and Wales) Regulations 2009 to reinforce the network and replace the existing overhead conductor, change defective poles including replacing stays where necessary to ensure ongoing network performance Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Mar 2026
✓
Validated
9 Apr 2026
Decision
Target date was 20 May 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 228.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
1 listed building within 150 m; Inside the Leverton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Consultation to LPA
Postcode
PE22 0AZ
Received
31 Mar 2026
Validated
9 Apr 2026
Case officer
Show
Target decision
20 May 2026
Decision level
Delegated Decision

Decision outlook

Day 228, past the statutory target. 85% of utility and infrastructure works in Boston are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 228172 days past the 56-day target
81%decided within 8 weeks
96%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
20 May 2026
Env. assessment
No