Caravan Adj To 18 Westheath Road Bodmin Cornwall PL31 1QG Data via plota.co.uk

PA26/05088 - Full application Awaiting decision

Proposal

Construction of a 3 Bed Dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 24 Aug 2026
✓
Consultation
18 Sept 2026
Decision
Expected by 19 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 18 Oct 2026, from Cornwall's recent new homes.

Comments are open until 9 Oct 2026

Comment on this application ↗

Documents 27

Statements & assessments 24

PDF DESIGN AND ACCESS STATEMENT Statement - Design and Access · 26 Aug 2026 View ↗ PDF CONTAMINATED LAND REPORT Assessment - Land Contamination · 24 Aug 2026 View ↗ PDF ARBORICULTURAL ADVICE Tree Survey/Report · 3 Aug 2026 View ↗ PDF ATTENUATION Assessment - Flood Risk · 3 Aug 2026 View ↗ PDF GREEN INFRASTRUCTURE STATEMENT Statement - Green Infrastructure · 3 Aug 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL AND BNG Assessment - Ecological · 3 Aug 2026 View ↗ PDF ECOLOGY TRIGGER LIST Ecology Report Trigger Table · 3 Aug 2026 View ↗ PDF ENERGY STATEMENT Energy Report · 3 Aug 2026 View ↗ PDF ENERGY SUMMARY TOOL Energy Summary Tool · 3 Aug 2026 View ↗ PDF ASSESSMENT - FOUL DRAINAGE Assessment - Foul Drainage · 3 Aug 2026 View ↗ PDF 3001 REV A CONCEPTUAL DRAINAGE LAYOUT Plan - Drainage · 3 Aug 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Assessment - Flood Risk · 3 Aug 2026 View ↗ PDF SAP COMPLIANCE REQUIREMENTS Energy Report · 3 Aug 2026 View ↗ PDF BNG METRIC Biodiversity Net Gain · 3 Aug 2026 View ↗ PDF BNG METRIC Biodiversity Net Gain · 3 Aug 2026 View ↗ PDF TREE CONSTRAINTS PLAN Tree Survey/Report · 3 Aug 2026 View ↗ PDF ENERGY SUMMARY TOOL Energy Summary Tool · 30 Jul 2026 View ↗ PDF 3001 REV A CONCEPTUAL DRAINAGE LAYOUT Plan - Drainage · 21 Jul 2026 View ↗ PDF FLOOD RISK ASSESSMENT Assessment - Flood Risk · 21 Jul 2026 View ↗ PDF GREEN INFRASTRUCTURE FORM Statement - Green Infrastructure · 21 Jul 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL AND BIODIVERSITY NET GAIN REPORT Assessment - Ecological · 21 Jul 2026 View ↗ PDF BIODIVERSITY METRIC Biodiversity Net Gain · 21 Jul 2026 View ↗ PDF TREE CONSTRAINTS PLAN Tree Survey/Report · 21 Jul 2026 View ↗ PDF ARBORICULTURAL REPORT Tree Survey/Report · 21 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 2

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Bodmin built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL31 1QG
Received
around 24 Aug 2026
Validated
24 Aug 2026
Ward
Bodmin St Mary's And St Leonard
Parish
Bodmin
Case officer
Show
Target decision
19 Oct 2026
Applicant
Show
Agent
The Residential Design Studio

Decision outlook

Day 46 of the 56-day target. Cornwall usually decides new homes by day 55.

Day 4610 days to the 56-day target
68%decided within 8 weeks
88%approved
100%go to committee

Plota live figures for new homes decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15099122
Planning Portal ref
PP-15099122
Comments by
9 Oct 2026
Site or press notice
18 Sept 2026
Statutory expiry
19 Oct 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026